$51,252. That is the 2025 Cost vs Value report's average job cost for a basement remodel in Salt Lake City (source), and it is the local benchmark for a Draper basement. It describes one defined job, and a real quote depends on your house.
Corner Canyon Basements is a referral service. It connects Draper homeowners with licensed local contractors, who do the work. Asking for a match costs you nothing.
Six numbers to know before you call anyone
| Number | What it is | Where it comes from |
|---|---|---|
| $51,252 | Average job cost, Salt Lake City basement remodel | Cost vs Value 2025 |
| 75.8% | Share of that cost recouped at resale in Salt Lake City | Cost vs Value 2025 |
| $100 | Draper City's basement permit application fee | Draper basement submittal sheet |
| 7 feet | Minimum ceiling height Draper plans must protect | Draper basement submittal sheet |
| 1 in 3 | Utah homes with elevated radon | Utah DEQ |
| 4 pCi/L | Radon level at which the EPA recommends fixing a home | EPA |
The $100 fee is Draper City's own. The 7-foot minimum comes from the 2021 International Residential Code as adopted in Utah, which lets beams and ducts in a basement project to within 6 feet 4 inches of the finished floor (R305.1 on UpCodes, a third-party copy of the code); Draper's submittal sheet asks plans to show it. Rules and fees change, so confirm each one with the Draper City Building Division at (801) 576-6399 before you plan around it.
Four checks that come before drywall
1. A radon test. The EPA says to test before a remodel starts, because fixing a radon problem is usually easier and cheaper before the basement is finished (EPA). The full basement finish page covers what to do with the result.
2. Escape openings. The 2021 International Residential Code, as adopted in Utah, requires an emergency escape and rescue opening in a basement, and one in each basement bedroom (R310.1 on UpCodes, a third-party copy of the code). Sizes and window wells are on the egress windows page.
3. Smoke and carbon monoxide alarms. Smoke alarms go in each bedroom, outside each sleeping area and on each story including the basement (R314.3 on UpCodes, a third-party copy of the code). Utah amended the code so carbon monoxide alarms go on each level of the home and outside each sleeping area (Utah Code 15A-3-202).
4. A permit. Draper City requires a building permit for home work such as basement finishes (Draper City ADU and permits page). The Building Division reviews plans, issues permits and inspects the work (Draper City). The permits page walks through the steps. Rules change, so confirm with the Building Division at (801) 576-6399.
Where to go from here
- Full basement finish: the stages, the moisture and radon checks, and what to ask a contractor.
- Egress windows and window wells: the size rules a bedroom window must meet.
- A basement bedroom: what makes a room a legal bedroom.
- A basement bathroom: drains, ventilation and who is licensed to do the plumbing.
- A basement apartment: Draper's accessory dwelling unit rules.
- Basement finishing cost: every price, with its source.
Draper homes
Draper had 51,017 residents at the 2020 census, up from 7,143 in 1990 (Wikipedia). It stayed a small farming community until the late 1990s, then grew fast. Corner Canyon Basements takes requests from homes across Draper, from SunCrest high above the city to the old town center around Fort Street and 13200 South, and also considers requests from nearby Riverton, Bluffdale, South Jordan, Sandy, Alpine and Highland.
The city rules here are Draper City's. If your home sits in a neighboring city, that city's building office sets its own process.
How to ask for a match
There are two ways to ask: the form on this page, or a call to (385) 247-7153. Say how many bedrooms you want, whether you want a bathroom or a second kitchen, and whether the basement has ever had water or damp walls. A licensed local contractor can then contact you.
Check any contractor's license yourself. The Utah Division of Professional Licensing runs a free online lookup (Licensee Lookup and Verification System). The cost page sets out what the published figures cover, and the permits page sets out the city steps to ask a contractor about.
Where these numbers come from
Costs are from the 2025 Cost vs Value report and city figures from Draper's basement submittal sheet, all read in November 2026.