Ten stages, and one rule that decides the order: test for radon and check for water before anything gets covered. This page walks the job as a licensed contractor would run it. Corner Canyon Basements is the referral service that connects Draper homeowners with those contractors, and the contractor does the work.
The ten stages
- Walk-through and design. The contractor measures the space and notes the furnace, water heater, water main, sewer cleanouts and electrical panel. Those must stay reachable. Rooms get drawn, and the ones that will be bedrooms get marked, because a bedroom brings in the escape-window rules on the egress windows page.
- Water and radon. The EPA says to do both before other work begins; the details are below.
- Permit and plans. Draper City's Building Division takes permit applications through its online portal. The permits page has the steps and the fee. Rules and fees change, so confirm with the Building Division at (801) 576-6399.
- Egress windows. If a bedroom needs a bigger window, the contractor cuts the foundation wall and sets a window and a well. This is structural work for a licensed contractor, not a weekend project.
- Framing. Walls go in from the concrete, with soffits around ducts and fireblocking in the cavities.
- Rough-ins. Electrical, plumbing and heating and cooling runs, including the alarms. These are separate trades with separate licenses.
- Rough inspection. The inspector looks at framing, wiring, plumbing and ducts while the walls are open.
- Insulation, then any inspection Draper's Building Division schedules for it (you can look inspections up in the city's portal).
- Drywall and finishes. Hang, tape, sand and paint, then doors, trim, flooring, cabinets, fixtures and stairs.
- Final inspection. Ask the contractor to show you that the final inspection has passed before the space is used.
1 in 3: radon comes first
The Utah Department of Environmental Quality says 1 in 3 Utah homes have elevated radon levels (Utah DEQ). The EPA recommends fixing a home when the level is 4 pCi/L or more (EPA). It also says to test before you begin a remodel, since a fix is usually easier and cheaper before the basement is finished (EPA).
The usual fix is a pipe and fan under the slab, called sub-slab depressurization. The University of Utah's radon lab puts the average mitigation system at around $2,000 (University of Utah radon lab). Ask your contractor to name the radon test in the scope, and decide what happens at 4 pCi/L before framing starts.
Moisture second
The EPA says to check a basement for leaks and other signs of moisture before converting it to living space, and to fix moisture problems before other work begins (EPA). Look for damp walls, white mineral crust on concrete, stains, a musty smell and window wells that hold water.
Snow usually falls regularly in Draper from November through March (Wikipedia). Ask the contractor to look at gutters, downspouts and the slope of the yard as well as the walls inside. A finish built over a damp wall hides the problem behind drywall.
7 feet: the ceiling
The 2021 IRC requires a ceiling height of at least 7 feet in habitable space (R305.1 on UpCodes, a third-party copy of the code). In a basement, beams, girders and ducts may project down to within 6 feet 4 inches of the finished floor. Draper's basement submittal sheet asks for a cross-section showing ceiling, fur-down and soffit heights, and says surface-mounted lighting cannot intrude into the 7-foot minimum (Draper City Building Division). Low ducts and beams decide where the ceiling can go. For how the city reads yours, call the Building Division at (801) 576-6399, since rules change.
Stairs and insulation
Utah's amendments set a maximum stair riser of 8 inches and a minimum tread depth of 9 inches (Utah Code 15A-3-202). The IRC requires at least 6 feet 8 inches of headroom over a stairway (R311.7.2 on UpCodes, a third-party copy of the code). Basement walls around conditioned space need R-10 continuous or R-13 cavity insulation at minimum under Utah's amended energy chapter (Utah Code 15A-3-203).
Alarms
Smoke alarms are required in each bedroom, outside each sleeping area and on each story, basement included. Several alarms in one home must be interconnected so one sets off all of them, and listed wireless alarms are allowed (R314 on UpCodes, a third-party copy of the code). Utah requires carbon monoxide alarms on each level and outside each sleeping area (Utah Code 15A-3-202). When a permitted alteration is done, the whole dwelling unit gets smoke alarms placed as for a new home.
What goes wrong
- Finishing over a damp wall, then finding mold.
- Boxing in a shutoff or a cleanout.
- A bedroom with no legal escape window, which can cause trouble at resale.
- Ducts or beams that leave the ceiling too low.
- Skipping the permit, which can surface at sale or with an insurer.
- Carpet laid straight on a cold slab.
- A finish that changes airflow around a gas furnace or water heater.
What to ask a contractor
- Is your license active, and in which classification? You can check it on the state lookup.
- Who pulls the permit, and how many inspections do you expect?
- Will licensed trades do the electrical, plumbing and heating work? Utah's residential and small commercial license excludes plumbing, electrical and mechanical work (Utah Code 58-55-102).
- Which rooms can legally be bedrooms, and what will each window and well cost?
- Did you check for moisture, and will a radon test come before framing?
- How will the furnace, water heater, panel and cleanouts stay reachable?
For prices, see the cost page. To start, use the form or call (385) 247-7153.
Where these numbers come from
Radon figures are from the Utah DEQ, the EPA and the University of Utah, the ceiling rule from UpCodes' third-party copy of the 2021 IRC, and Draper's plan requirements from its submittal sheet, all read in November 2026. The radon cost is a general average, not a Draper price.